
Install Material Bottles
For the purpose of the
Demo print
, we will use only two bottles of
support material
and
1.
two bottles of
part material
. Make certain that the two bottles of part material are the
same type.
Unpack the
material bottles
and the Global Health and Safety (GHS) Sheet from cartons.
2.
Save sleeves and material carton to store partially used material bottles.
Press and release the upper left
material delivery module
to open it. Install two bottles of
3.
support material
into the MDM. Pull levers up and place bottle down into the
holder
.
Press on the top of the material bottle until you hear a click to make certain the bottles
are fully seated.
Press and release the upper right
material delivery module
to open it. Install two bottles
4.
of part material into the MDM. Pull
levers
up and place bottle down into the holder. Press
on the top of the material bottle until you hear a click to make certain the bottles are fully
seated.
As previously stated, only
two MDM
are loaded with material for the
Demo print
.
5.
Subsequent build jobs will require all MDMs to be fully loaded with both support and part
material.
Содержание 5500X
Страница 3: ...At A Glance...
Страница 4: ......
Страница 9: ...Press Demo Print Select the mode HD or UHD for the Demo Print...
Страница 14: ...FOR MORE DETAILED INFORMATION PLEASE REFER TO THE PROJET 5500X USER GUIDE...
Страница 15: ......