![Projecta INTELLI-RV PM200 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/projecta/intelli-rv-pm200/intelli-rv-pm200_instruction-manual_1614114016.webp)
16
Figure 23 Dip Switch of PM200
Table 12 Dip Switch definition
6. OPERATION
6.1 Configuration on PM200
You could configure the battery type and capacity through PM235 master power unit.
6.1.1 Battery Capacity and Battery Type
There is a dip switch for you to set battery capacity and battery type.
DIP
SWITCH
1
2
3
4
Battery Capacity
Battery Type
Dip switch definitions:
Table 13 Battery Capacity setting by dip switch
Table 15 Factory default setting
DIP SWITCH
1
2
3
4
STATUS
OFF
OFF
OFF
OFF
Factory default setting:
Configure the max charging current of PM235:
Configure the battery type connected:
DS1
DS2
BATTERY
CAPACITY
CHARGING
CURRENT OF
PM235
ON
ON
50Ah
5A
ON
OFF
100Ah
10A
OFF
ON
150Ah
15A
OFF
OFF
200Ah
20A
When choosing max charging current, please take
into consideration the consumption of the DC load
connected with the system.
DS3 DS4
BATTERY
TYPE
ABSORPTION FLOAT
OFF OFF
AGM
14.4V
13.5V
OFF ON
GEL
14.1V
13.5V
ON
OFF
LiFePO
4
14.4V
13.5V
ON
ON
WET
14.7V
13.7V
Table 14 Battery Type setting by dip switch
1 2 3 4
ON
OFF