background image

For OSB Roof Sheet ONLY

Roof Sheet fixing ONLY

Position the Roof Sheet to the
top of truss and panels 

Back

Roof Sheet fixing ONLY

Fix the Roof Sheet
to the truss, roof
support and panels

Back

N30

Nails

Roof Sheet ONLY

Fix the Eaves Purlin
to the Roof Sheet

4

 N30

Nails

Roof Sheet fixing ONLY

Repeat previous stages and
fix the all the Roof Sheet

Front

N30

Nails

N30

Nails

Roof Sheet fixing ONLY

*Important*

Push up the Roof Panels
to the centre when fixing.
This will make the building
ridgid.

 

N30

Nails

27

30

31

28

29

Содержание Cannes Summerhouse

Страница 1: ...nstruction carefully and retain for future reference For Queries and Help please contact 01777 802300 Please note that all images are for illustration purpose only V1 6 08 05 21 INS0070 12x8 Cannes Su...

Страница 2: ...forweathertochangebeforenotifyingusifyounoticechangesinthestructure TOOLS REQUIRED Drill with 4 5 3 and 2mm drill bit Hammer Spirit Level Measuring Tape Screwdriver Phillips Stanley Knife Wood Saw Ste...

Страница 3: ...panels larger parts as the glazing comes banded together and is placed between the panels along with the fixing kit for safer transportation If they are still not found please visit our Support Centr...

Страница 4: ...12x8 Cannes Summerhouse with French Doors shown 10x8 Cannes Summerhouse with French Doors shown 8x8 Cannes Summerhouse with French Doors shown 8ft Gable Cannes Summerhouse Buildings...

Страница 5: ...sembly 1199mm x 1172mm 6 8x8 Floor Assembly 1199mm x 1172mm 4 10x8 Roof Position 4ft 3ft 3ft 3ft 3ft 4ft 12x8 Roof Position 4ft 4ft 4ft 4ft 4ft 4ft 8x8 Roof Position 4ft 4ft 4ft 4ft 8ft Gable Cannes S...

Страница 6: ...Panels Position 4ft Plain Panel 4ft Plain Panel 10x8 Front Panels Position Door Panel 2ft Plain Panel 2ft Plain Panel 12x8 Front Panels Position Door Panel 3ft Plain Panel 3ft Plain Panel 8x8 Front Pa...

Страница 7: ...sition Back Front For Floor Insulation only Before constructing the building cut the insulation foil to size and staple to the underside of the floor panels Back Side Plain Panel Floor Assembly Gable...

Страница 8: ...anel position S50 Screws Front Side Fix the Back Panels secure the panels to the floor panels Pilot drill holes before fixing 6 S50 Screws Front Pilot drill holes before fixing 4 S50 Screws Front Fix...

Страница 9: ...tcher and fix at the back of valance panel Pilot drill holes before fixing Centre Purlin fixing Detail B Detail A S50 Screws Pilot drill holes before fixing S50 Screws Detail A Detail B Centre Purlin...

Страница 10: ...n the trusses These braces only fit between the 1172mm OSB roof sections S50 Screws Detail A Detail B Roof Support Brace fixing Pilot drill holes before fixing Centre Purlin Position 879mm or 1172mm 8...

Страница 11: ...h up the Roof Panels to the centre when fixing This will make the building ridgid 10 S70 Screws Pilot drill holes before fixing Roof Panel fixing ONLY Position the Roof Panel to the top of truss and p...

Страница 12: ...russ roof support and panels Back N30 Nails Roof Sheet ONLY Fix the Eaves Purlin to the Roof Sheet 4 N30 Nails Roof Sheet fixing ONLY Repeat previous stages and fix the all the Roof Sheet Front N30 Na...

Страница 13: ...the Beading Put Silicone sealant around the Beading for better waterproofing protection Panel Pins Door Glazing and Door Beading fixing Use Cardboard to protect the Glazing when fitting the Beading P...

Страница 14: ...Screws Door Hinge fixing Pilot drill holes before fixing S30 Screws Door Beading position Important Door Beading fitted on the front of the door Front Tower Bolt Fixing Bottom Top S30 Screws S30 Scre...

Страница 15: ...S30 S30 Press Lock Fixing Pilot drill holes before fixing 2 S30 Screws Door Lock Block fixing Door Lock fixing Fix the Press Lock and Door Lock Block Turn Button Lock fixing Position and fix the turn...

Страница 16: ...Screws Pilot drill holes before fixing Door Cloaking fixing Fit and fix the Door Cloaking Strips at the back of the door S30 Screws Roof Felt fittings Measure and cut 3 lenghts of Felt Roof length 140...

Страница 17: ...s T10 Felt Tacks 1 2 3 Roof Felt fittings Tack every 100mm Tack Top corners to hold in place N30 Nails Cut to size Cloaking Strip fixing N30 Nails Cloaking Strip fixing The Felt must lay on the top of...

Страница 18: ...Finials fixing Panel Pins Pilot drill holes before fixing Fascia fixing N30 Nails 62 63...

Отзывы: