Adjustments
8 / 16
51700008
V1
GB
4
Adjustments
4.1
General
Proceed as follows to move the handle from the transport
position to the working position:
•
Pull out one of the two spring latches (1) and turn it.
•
Pull out the other spring bolt (1) as well and at the same
time fold up the operating handle and let the spring bolt re-
engage (see figure).
•
Turn opposite spring bolt again and let it snap in.
The operating handle can be tilted to the size of the respective
operator in three
working positions.
•
Pull out and turn both spring latches (1).
•
Move the operating handle to the desired position in the
perforated disc (2).
•
Then turn both spring latches (1) again and let them
engage.
•
A water hose must be attached to the pre-installed water
connection when
slurrying
(see
).
Содержание EASYFILL EF-H-GREENLINE
Страница 3: ......
Страница 4: ......
Страница 22: ......
Страница 23: ...Fig 1 Fig 2 Fig 3 2 3 1 4 5 6 ...
Страница 50: ......
Страница 51: ...Fig 1 Fig 2 Fig 3 2 3 1 4 5 6 ...
Страница 60: ......