background image

7

PROBRITE.COM

Please call 1-844-507-5651 or email [email protected] for further assistance.

6

Visit 

www.probrite.com/install

 for installation video tutorials and product support

Installation (continued)

3

Remove the 
mounting base plate

C

D

E

D

NOTE: 

The mounting plate tightening screws 

(C) comes pre-installed on the light fixture.

 

Loosen the two mounting base 
tightening screws (C) using a philips 
screwdriver and remove the refractor.

 

Remove the reflector from the base 
plate (D)  by loosening the two small 
screws.                                      

4

5

Knock out holes on 
mounting base

Installing the mounting base

Installation (continued)

6

Making the electrical 
connections

(fig 1b).

(fig 1a).

(fig 1).

(fig 1).

(fig 1).

(fig 2).

Junction box Mount

Junction box Mount

Surface Conduit Mount

 

Route the junction box wires through 
the large center hole in the mounting 
base (D).

 

Align the holes on the mounting 
base (D) with the holes on your 
junction box. Use two #8 screws (AA), 
depending on the size of the holes in 
your junction box, attach the mounting 
base (D) to your junction box. (Fig. 1)

 

Follow the wiring instructions 
given below to make the electrical 
connections. (Fig. 1)

 

Mark and drill two holes on the wall 
surface as per the desired location for 
fixing the mounting plate (D).

 

Use two or more suitable screws 
(provided by others) applicable to 
the surface of mounting and fix the 
mounting plate (D) on the surface. 
(Fig. 2)

 

Refer to the guide in Fig. 1a  to select 
the holes to knock out or measure your 
junction mounting holes and determing 
proper knock-outs on the fixture's back 
housing.

 

Use a flat head hammer and screw 
driver to knock out two holes in the 
mounting base (D) in the desired 
location to align properly with the 
junction box. (Fig. 1b)

Small screws

Reflector

CAUTION: 

DO NOT touch the LED and 

Photocell lens (E) inside the fixture. DO NOT 

damage or soil the reflector.

D

AA

Screws 

(Provided by others)

Содержание LUNA20-PC-4K-BZ

Страница 1: ...ng Parts Need Accessories Visit us online anytime or call us to get information on our product range download detailed spec photometric files find product and mounting accessories view installation tu...

Страница 2: ...to cool before touching NOTICE Do not connect this fixture to a dimmer switch Pre Installation PLANNING INSTALLATION Before installing the light fixture ensure that all parts are present Compare part...

Страница 3: ...installation for recessed mount application fig 2 fig 2 2 Shut electric power off At wall switch verify it is in the off position fig 1 At the main electrical panel turn off the circuit breaker that...

Страница 4: ...Align the holes on the mounting base D with the holes on your junction box Use two 8 screws AA depending on the size of the holes in your junction box attach the mounting base D to your junction box...

Страница 5: ...de the fixture as per the instructions given below Conduit To enable dusk to dawn operation remove temporary black label cover and ensure the photocell E has no cover on it and is unobstructed Ensure...

Страница 6: ...Fixture is sensing daylight Cover photocell Wait several seconds until fixture turns ON Light cycles ON and OFF continuously Photocell light sensor is sensing reflected light Relocate light fixture t...

Страница 7: ...PROBRITE Customer Service 9am 5pm EST Monday to Friday 1 844 507 5651 support PROBRITE com PROBRITE COM Questions Missing Parts Need Accessories RETAIN THIS MANUAL FOR FUTURE USE Para las translacione...

Отзывы: