Page 33
Please go through the following checklist before powering up the power supply(s).
The installation meets the requirements in CLG-Section 2.
Make sure all connections to the terminal blocks are secure (potential danger of short circuit).
Label your AC and DC wiring accordingly so that any service personnel can identify them easily.
Do not make modifications while in operation. Risk of electrical shock can be fatal.
Questions?
SP - SECTION 5
Содержание Digi-Brite CLG-100-12
Страница 6: ...Page 4 Model SP 150 12 AC Voltage Input 110 120VAC AC Amperage 2 5A DC Voltage Output 12VDC UNITS MM...
Страница 7: ...Page 5 Model SP 320 12 AC Voltage Input 110 120VAC AC Amperage 5A DC Voltage Output 12VDC UNITS MM...
Страница 15: ...Page 2 Page 13 Your 110VAC source should not be hot until all connections are completed Decimal Panel SP 320 12...
Страница 22: ...Page 20 Model CLG100 12 AC Voltage Input 110 120VAC AC Amperage 0 8A DC Voltage Output 12VDC UNITS MM...
Страница 28: ...Page 2 Page 26 Your 110VAC source should not be hot until all connections are completed CLG 100 12 Sign Panel...