background image

Pro-LIFT G4U WM Assembly Sheet 

                          

 

 

 

 

STEP 5 

Install Projector Mount End Caps 

(Requires

 

4

 

End

 

Caps)

 

Align

 

the

 

end

 

cap

 

with

 

the

 

end

 

of

 

the

 

projector

 

mount.

  

Insert

 

end

 

cap

 

into

 

end

 

of

 

projector

 

mount

 

and

 

gently

 

tap

 

with

 

rubber

 

mallet.

 

STEP 6 

Install SMART Board Hanger 

(As

 

per

 

manufacturer’s

 

specification)

 

For

 

1

 

Hanger/Requires

 

3

 

bolts

 ‐ 

For

 

2

 

Hangers/Requires

 

6

 

bolts

 

Use

 

holes

 

which

 

correspond

 

to

 

manufacturers

 

recommended

 

projector

 

to

 

image

 

distance.

 

Note

 

there

 

are

 

drilled/tapped

 

holes

 

on

 

the

 

wall

 

mount

 

leg

 

if

 

lowering

 

the

 

board

 

is

 

required.

 

BE

 

SURE

 

TO

 

NOT

 

OVER

 

TIGHTEN

 

IF

 

LOWERING

 

BOARD

 

MOUNT!

 

 

 

 
 

 

 
 

 

STEP 7 

Install Projector 

(Requires

 

4/6

 

screws

 

depending

 

on

 

projector)

 

Match

 

the

 

holes

 

to

 

the

 

projection

 

system

 

in

 

the

 

diagram

 

to

 

the

 

right.

 

Fasten

 

your

 

projector

 

to

 

the

 

corresponding

 

holes

 

using

 

the

 

JORO

 

button

 

head

 

screws

 

supplied

 

by

 

JORO.

 

Note:

 

Projector

 

mount

 

bars

 

may

 

not

 

be

 

exactly

 

as

 

shown.

  

BE

 

SURE

 

TO

 

NOT

 

OVER

 

TIGHTEN!

 

STEP 8 

Attach Cable Management Trough 

(Requires

 

2

 

Cable

 

Management

 

Troughs)

 

JORO

 

recommends

 

attaching

 

the

 

two

 

cable

 

management

 

troughs

 

supplied.

  

Remove

 

the

 

film

 

from

 

the

 

double

 

sided

 

tape

 

and

 

attach

 

one

 

on

 

the

 

back

 

side

 

of

 

both

 

wall

 

mount

 

legs.

 

K

K

K

 

K

 

D

D

 

Wall Mount Leg

Wall Mount 

Leg 

5

Отзывы: