Pro-LIFT G4U WM Assembly Sheet
STEP 5
Install Projector Mount End Caps
(Requires
4
End
Caps)
Align
the
end
cap
with
the
end
of
the
projector
mount.
Insert
end
cap
into
end
of
projector
mount
and
gently
tap
with
rubber
mallet.
STEP 6
Install SMART Board Hanger
(As
per
manufacturer’s
specification)
For
1
Hanger/Requires
3
bolts
‐
For
2
Hangers/Requires
6
bolts
Use
holes
which
correspond
to
manufacturers
recommended
projector
to
image
distance.
Note
there
are
drilled/tapped
holes
on
the
wall
mount
leg
if
lowering
the
board
is
required.
BE
SURE
TO
NOT
OVER
TIGHTEN
IF
LOWERING
BOARD
MOUNT!
STEP 7
Install Projector
(Requires
4/6
screws
depending
on
projector)
Match
the
holes
to
the
projection
system
in
the
diagram
to
the
right.
Fasten
your
projector
to
the
corresponding
holes
using
the
JORO
button
head
screws
supplied
by
JORO.
Note:
Projector
mount
bars
may
not
be
exactly
as
shown.
BE
SURE
TO
NOT
OVER
TIGHTEN!
STEP 8
Attach Cable Management Trough
(Requires
2
Cable
Management
Troughs)
JORO
recommends
attaching
the
two
cable
management
troughs
supplied.
Remove
the
film
from
the
double
sided
tape
and
attach
one
on
the
back
side
of
both
wall
mount
legs.
K
K
K
K
D
D
Wall Mount Leg
Wall Mount
Leg
5