8
3
3. With the help of a second person, place some
of the packing materials (not shown) under the
front of the Frame (1).
Have the second per-
son hold the Frame to prevent it from tipping
while you complete this step.
Attach the Front Stabilizer (3) to the Frame (1)
with two M10 x 115mm Screws (104).
Remove the packing materials from under the
front of the Frame (1).
1
3
104
4
4. Orient the Upright (4) and the Upright Cover (23)
as shown. Slide the Upright Cover upward onto
the Upright.
While a second person holds the Upright (4)
near the Frame (1), connect the Upper Wire
(116) to the Lower Wire (115).
Insert the excess wire into the Frame (1).
4
1
116
23
115
Содержание ZE 6
Страница 4: ...4 all STANDARD SERVICE PLANS...