pro comp 56713B Скачать руководство пользователя страница 14

14 

56713B/K2079B 

Revised 

2.19.15 

1.  Block the front tires and raise the rear of 

the vehicle. Support the frame with jack 
stands forward of the rear springs. 

2.  Remove the wheels and tires. 

3.  Remove the shocks on both sides of the 

vehicle. It may be necessary that you 
slightly raise the axle to unload the 
shocks for removal. 

4.  Remove the factory bump stop from the 

frame. 

5.  Fit 2 of the new  BUMP STOP BRACK-

ETS 

90-3081 

together as shown in 

Illus-

tration A

.  Then bolt to the frame using 

the factory bolts. 

6.  Using the hardware 

from pack 

90-6223 

bolt the bump stop to 
the brackets. As 
shown in 

Illustration 

A

.  

7.  Repeat the installation 

on the other side of 
the vehicle. 

8.   Loosen the U-bolts 

on the passenger 
side. Remove the U-
bolts on the drive 
side.  

9.  Install the lift block 

(95-300D) 

on the axle 

pad and use your floor 
jack to raise the axle to 
the spring.  Apply a 
slight amount of pres-
sure with your floor 
jack against the spring 
pack and engage the 
centering pins into the 
locating holes at the 
top of the lift block. 
   

NOTE: The fac-

tory spring pack will have two metal 
pins on the bottom, it may have a third 
plastic pin in the center. To install the 
lift block this plastic pin can be re-
moved with a pair of pliers.  

 

 

10.  Secure the assembly with the U- bolts 

13-90330 

and new high-nuts and washers 

from hardware pack 

20-65302

. Do not 

  tighten the U-bolts at this time. See 

Il-

lustration B

.  

 

 

NOTE: make sure the block sits flush 

on the axle perch.

 

 

NOTE: If the vehicle is equipped with 

a Dana 80 rear end, use U-bolts 13-90328 
and hi-nuts 20-65471.  The holes in the 

Rear Installation 

ILLUSTRATION A

 

3/8” HARDWARE 

FROM PACK 90-6223 

 

BUMP STOP BRACKETS 

90-3081 

 

OE BOLT

 

Содержание 56713B

Страница 1: ...formation that includes warranty information and instructions for resolving problems you may encounter Please keep it in the vehicle as a permanent record K2079B K2079BMX K2079BP 56713B 56713BMX 56713...

Страница 2: ...CK Sway Bar 1 70 0371501500 3 8 x 1 1 2 USS Gr 5 Bolt 2 7 11 70 03725001500 3 8 x 2 1 2 USS Gr 5 Bolt 2 7 11 72 03700100512 3 8 USS LOCKNUT 4 7 11 73 03700030 3 8 SAE FLAT WASHER 4 7 11 73 03700042 3...

Страница 3: ...LOWER ARM 4 4 8 90 8083 SLEEVE 2 4 8 Box 2 of 3 PN 56716B 2 91 7658 TRACK BAR DROP BRACKET 1 11 14 90 6874 HARDWARE PACK Track Bar Drop Bracket 1 90 4460 TRACK BAR NUT 1 11 14 90 8233 CROSSMEMBER SLE...

Страница 4: ...ER 2 2 7 7 11 MX6100 REAR SHOCK MX 6 SHOCK ABSORBER 2 Box 3 of 3 PN 56713B 3 COIL SPRINGS 56160 Diesel For 56713 6 Coil Spring kit COIL SPRINGS 56170 Gas For 56713 6 Coil Spring kit Transmission Brack...

Страница 5: ...p lift kit is a positive experience variations in construction and assembly in the vehicle manufacturing process will virtually ensure that some parts may seem difficult to install Additionally the cu...

Страница 6: ...com pressor tool 9 Locate the top shock mount in the engine compartment Remove the nut retainer and grommet from the shock See ILLUS TRATION 2 10 Unbolt the shock absorber from the lower mount bracket...

Страница 7: ...lied sleeves IMPORTANT 2010 models Install the bushings PN 15 10978 and sleeves 90 8083 from hardware pack 90 6748 into the new lower control arm front arm axle end as shown in ILLUSTRA TION 4 19 Inst...

Страница 8: ...aust may need to be removed on the driver and passenger side If so remove exhaust hanger bushings Undo clamp on the turbo or unbolt from the header Move exhaust out of the way to get the control arm b...

Страница 9: ...proper torque reading Install Pitman arm retaining nut and tighten until snug 29 Insert the key and unlock the steering wheel 30 Install the Pitman arm torque tool 96 5779 to the Pitman arm using one...

Страница 10: ...etaining nut to the sector shaft and torque to 225 ft lbs NOTE Whether re using the exist ing pitman arm retaining nut or replac ing with a new nut thread locking com pound must be used 36 Unbolt and...

Страница 11: ...on the other side of the vehicle 44 Install the hose clamps and screws from hardware pack PN 90 6029 to the brake lines 45 Bolt the front brake line extension brack ets PN 90 1539 to the original OE b...

Страница 12: ...LUSTRATION 9 NOTE Be sure to use thread locker on this bolt DO NOT the bolt torque at this time 46 Insert the 7 16 X 788 split sleeve 61734 into the crossmember hole clos est to the driver side track...

Страница 13: ...am to center the axle under the vehicle by rotating the cam until the measurement is equal on both sides Torque the cam bolt to 150 ft lbs 50 See the driveshaft note on page 15 See ILLUSTRATION 10 51...

Страница 14: ...on the drive side 9 Install the lift block 95 300D on the axle pad and use your floor jack to raise the axle to the spring Apply a slight amount of pres sure with your floor jack against the spring p...

Страница 15: ...MX6100 or ZX2001 and torque this hardware to 60 ft lbs 14 Reinstall the wheels and tires and lower the vehicle to the ground 15 Recheck the wheel lug torque on all four wheels at this time 16 Recheck...

Страница 16: ...90 9 16 95 130 M14 85 120 145 5 8 135 175 M16 130 165 210 3 4 185 280 M18 170 240 290 1 2 13x1 75 HHCS Grade 5 Grade 8 M12 1 25x50 HHCS No of Marks 2 G Grade Bolt Strength P Property Class Bolt Streng...

Страница 17: ...268 from BOM box 1 12 7 12 Removed BF BFR shocks from the text and from BOM box 3 Modified options box infor mation and front sway bar end link illustration 8 1 10 13 Added the side view illustration...

Отзывы: