![Prinsco HydroStor HS180 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/prinsco/hydrostor-hs180/hydrostor-hs180_design-manual_1603131007.webp)
Design Guide
Page 6
©2015 Prinsco, Inc | 800.992.1725 |
05/15
2.4
HydroStor Chambers
HydroStor Chambers are extremely versatile and can be configured as necessary to meet the site’s
needs. The chamber’s versatility enables the chamber layout to be designed to appropriately meet
the site conditions and avoid obstacles that may be interfering with a standard system layout. If a
run of chambers must be interrupted, for instance, an end cap can be placed on the row’s last
chamber. The row can then be restarted after the interruption.
To ease construction and provide easy in-field guidance, each chamber is marked with overlap
locations as well as the installation direction. (Figure 3) The assembly of each row is achieved by
over topping the last rib of the initial chamber with the first rib of the succeeding chamber. (Figure
4) Each chamber is designed with handles at the base for easier transport and construction in field
conditions. No connectors or other special tools are required. With the included handles, the
installation process continues smoothly and efficiently with two people.
Figure 3 - Chamber and End Cap Components
Содержание HydroStor HS180
Страница 1: ...DESIGN GUIDE...
Страница 35: ......