![Primus MB140 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/primus/mb140/mb140_installation-and-maintenance-manual_1602092025.webp)
24
INSTALLATION AND MAINTENANCE MANUAL
PUBLICATION DATE 07/04
513289
5.13. VALUES OF FUSES
Values of fuses you can find on electrical scheme delivered with machine.
Marking
Destined for:
FU1, FU2
transformer - primary winding
FU3
control circuits
FU4
motor ventilator
Tab.5.13.
5.14. EARTH LEAKAGE TRIPS
If the laundry is equipped with the earth leakage trip in the supply circuit of the electric switchboard, it is necessary
to test it regularly. The earth leakage trip is a very sensitive device and it provides a safety for operators
avoiding a risk of an electric shock while the machine is in operation.
WARNING !
A QUALIFIED WORKER MUST PERFORM A TEST OF THE EARTH LEAKAGE TRIP FUNCTION AT LEAST
ONCE IN 3 MONTHS.
THE TEST PROCEDURE:
Press the test push button of the earth leakage trip while it is under tension. The earth leakage trip must go off!
5.15. FREQUENCY INVERTER
Control of frequency inverter operation, running of motor and maintenance must be executed according
to Instruction manual for frequency inverter - chapter 5.3.
!
www.groupdynamics-laundry.com