Creating Discs
25
Queue Project
. To queue another project to run after the
current one is finished simply setup the project as you
normally would. When you get to the third step of the
project setup wizard, if a project is currently running a
Queue button will appear instead of a Go button. Click
it to queue the job.
B.4
Backup Project
. (PC Disc Publishers Only)
To create a new backup project you must setup a data project
and then schedule it. Follow these steps:
1. Choose Data Project from the project starter window.
2. Add the files or folders that you would like to backup.
Typically there will be more data to back up than will fit on
any one CD, DVD etc. If that happens you will receive a
warning message and the data bar at the bottom of the
screen will turn red.
To resolve this issue you may choose to span the data over
several CDs or DVDs or change the media to a different
type with more data capacity.
If you choose to check the span disc box you do not need
to change media type. A Span Report button will appear
which will tell you how the data will be distributed over
the chosen media type.
510963.qxd 11/2/2009 12:18 PM Page 25