Backpacker Series
www.pridemobility.com
11
I I I . I N S TA L L AT I O N
LIFT WIRING
CONNECTION
Figure 3. Wiring Harness Installation - Backpacker Plus
VEHICLE BATTERY
GROUNDING WIRE
FUSE
HAND CONTROL
6. Reinstall the 15-amp fuse to the wiring harness.
WARNING! Before operating the lift, inspect the wiring harness for proper routing and grounding.
Improper routing can cause damage to the harness, and improper grounding can cause damage to
the electrical system.
Optional onboard battery pack installation
The optional onboard battery is designed for easy
installation as it does not require wires to be routed
through or under the vehicle. If using the optional TYPE
II onboard battery pack, please refer to the manual
supplied with the pack for proper operating instructions
and harness connections.
Follow these steps to install the onboard battery
(Type I)
1. Remove the nuts and washers from the protruding
bolts on the side of the lift motor housing.
See figure 4.
2. Slide the spacer bar onto the protruding bolts, if not
already installed.
3. Mount the battery case onto the protruding bolts
and secure into position with the nuts and rubber
caps removed earlier.
See figure 4.
4. Insert the onboard battery into the battery case,
making sure that the connector on the bottom of
the battery aligns and fully connects with the mating
connector inside the battery case.
5. Connect the male connector on the battery cable to
the female connector at the base of the Backpacker.
6. Secure the battery cable to the other cables with
wire ties.
Figure 4. Onboard Battery installation (Type I)
NUTS
SPACER BAR
Содержание Backpacker AVP 2.0
Страница 24: ...24 www pridemobility com Backpacker Series N OT E S ...
Страница 49: ...Backpacker Series www pridemobility com 49 N OT E S ...
Страница 50: ...50 www pridemobility com Backpacker Series N OT E S ...
Страница 51: ......