background image

Flush Channel Installation Guide

2

v001  |  Flush Channel Installation Guide

Product Overview

The Node Flush Channel assembly consists of two mounting angles held together by intermittent mounting brackets, 
which interface with the channel face.   

The Node Flush Channel is designed to be installed between ceiling panels or plasterboard, in ceilings with recessed 
voids. 

The following guide should only be used for Node Flush Channel where PARC is not providing the diffuser or plenum. 
Please refer to our Node Flush Channel with Diffuser Installation Guide if you are installing with the Node with Diffuser. 

It is recommended that the Node Flush Channel length is coordinated with the manufacturer to the required sizes to 
match the building design. The Node Flush Channel can be site cut if required. 

The Node devices are supplied separately from the channel assemblies. 

Note:

   

 All mounting hardware and sub structure is to be supplied and installed alongside the Node Flush Channel.

 

Lighting and other services must be installed by qualified personnel.

  

For further information regarding product or installation, please contact 

[email protected]

.

Figure 1

9.84

250

OVERALL WIDTH

3.57

91

CHANNEL HEIGHT 

4.72

120

EXPOSED WIDTH

.23

6

RECOMMENDED CLEARANCE
W/ SURROUNDED CEILING 

Flush Channel with Weave Panel

4.72

120

FACE WIDTH

.40

10

.12

3

RECOMMENDED CLEARANCE
W/ SURROUNDING CEILING

11.81

300

OVERALL WIDTH

4.16

106

CHANNEL HEIGHT 

Flush Channel with Soft Cell Panel

Flush Channel with Weave Panel

Flush Channel with Soft Cell Panel

Содержание PARC Node

Страница 1: ...Flush Channel Installation Guide...

Страница 2: ...t Overview 2 Read and Save These Instructions 3 Before You Start 3 Tools Required 3 Site Conditions Storage and Handling Instructions 3 Flush Channel Installation Sequence 4 Access Cables 4 Connecting...

Страница 3: ...rdinated with the manufacturer to the required sizes to match the building design The Node Flush Channel can be site cut if required The Node devices are supplied separately from the channel assemblie...

Страница 4: ...be enclosed The Node Flush Channel should be kept clean dry and protected from the elements Site conditions should be prepared for installation of the Node Flush Channel The site should be clean dry...

Страница 5: ...hole provided Before connecting the channel face to the mounting assembly connect the other end of the Node access cable to the flange on the inside of the channel face in the hole provided When lowe...

Страница 6: ...ure a high quality joint between adjacent channel faces Figure 4 Figure 6 Figure 5 Connect all required sections ensuring no visible gap between both sections Finished installation should be as shown...

Страница 7: ...ength this should be done at the end rather than a joint to minimize visual impact The maximum length that can be trimmed is defined by the position of the bridge bracket Node Device Installation Node...

Страница 8: ...e Node removal tool anti clockwise until the Node device is released Figure 9 Waste Disposal Management PARC Node Channels are shipped and packaged with protective material that should be disposed of...

Отзывы: