7
H
ENGLISH
Installation
Start Up
• Call a professional electrician to carry out the electric
connection to the power supply, following the mandatory
rules.
• The fixed installation shall incorporate a device to assure
the omnipolar disconnect from the power supply.
• Make sure the electric requirements described in this
Instruction Manual and the pump nameplate, match with
the power supply value capacity.
• Connect the pump into a circuit with physical earth and
then, connect the phases following the electric diagram in
page 3 or the pump nameplate.
• The pump is built with a monophasic motor protected
against overload using a thermal device (overcurrent cut)
built in the winding.
Electrical Installation
Purge
• The first time you start the pump or after a long period of
time idle, or when air has entered the system, fill-up the
pump with clean water before starting.
• Remove the purge cap (
H
) and fill with water until
reaching the level un the orifice.
• Never start the pump when empty. If
it happens accidentally, turn OFF the pump immediately,
wait for the pump to cool down, then, fill with clean water.
WARNING
Содержание 27019
Страница 10: ...10 Notes ENGLISH ...
Страница 15: ...10 Notas ESPAÑOL ...