![Prestige Solo 175 Скачать руководство пользователя страница 59](http://html.mh-extra.com/html/prestige/solo-175/solo-175_installation-and-maintenance-manual_1598128059.webp)
53
Installation Record
SECTION XII - Installation Record
PRESTIGE Model Number:
Serial Number:
Date of Installation:
Fuel: Natural Gas Propane
Measured Rate of Input:
Combustion Readings:
CO
2
O
2
CO
The following items were completed during installation:
Installation instructions have been followed and completed
Check-out procedures have been followed and completed
Information regarding the unit and installation received and left with owner /
maintenance personnel.
Installer Information
(Company)
(Address)
(Address)
(Phone Number)
Btu/hr
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
_________________________________________________________________
%
%
ppm
Содержание Solo 175
Страница 21: ...Unit Preparations 15 Fig 5 Temporary Hydrostatic Test Piping Fig 6 Pressure Relief Valve Installation ...
Страница 38: ...32 Internal Wiring Fig 20 Prestige SOLO 175 and Solo 250 Boiler Factory Wiring ...
Страница 71: ...65 Product Specifications Front View Prestige SOLO 175 250 ...
Страница 72: ...66 Product Specifications Side View Prestige SOLO 175 250 ...