![Prestige Solo 175 Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/prestige/solo-175/solo-175_installation-and-maintenance-manual_1598128030.webp)
24
Boiler Piping
2
5
5
4
6
1
3
13
12
9
8
10
11
4
4
4
Radiant Zone
Additional
4
4
4
6
7
Radiant Zone
Max.
12"
Note:
Manifold mounted valve
actuators may be used in lieu of
zone valves.
1. PRESTIGE boiler
2. CH circulator
3. Flow check valve
4
Isolation valve
5. Zone valve
6. Drain/purge valve
7. Pressure relief valve
8. Air separator
9. Automatic air vent
10. Diaphragm expansion tank
11. Automatic fill valve
12. System circulator
13. High temperature limit control
Fig. 14: CH System Piping - Radiant/Low Temp. Heating
Содержание Solo 175
Страница 21: ...Unit Preparations 15 Fig 5 Temporary Hydrostatic Test Piping Fig 6 Pressure Relief Valve Installation ...
Страница 38: ...32 Internal Wiring Fig 20 Prestige SOLO 175 and Solo 250 Boiler Factory Wiring ...
Страница 71: ...65 Product Specifications Front View Prestige SOLO 175 250 ...
Страница 72: ...66 Product Specifications Side View Prestige SOLO 175 250 ...