
5
•
Make sure to drill the top and bottom
plates for the vertical electrical chases in
the wall panels.
•
Do not put plumbing inside SIPs.
•
Do not cut the skins (OSB) for extra
electrical chases or plumbing.
•
Do not pick up the SIPs by the edge of the
top skin.
•
Remove debris from sill plate before you
place the SIP wall panel on it.
•
Use mastic on all connections as shown in
the PBS details.
•
Make sure that both of the wall SIPs skins
are bearing on the floor.
•
Follow proper nailing requirements according
to details and job specific engineering.
•
Plumb each SIP in each direction, then secure
with nails.
•
Fill all voids with expanding foam.
•
Do not apply interior or exterior materials
over wet SIPs.
Содержание Floors
Страница 55: ...55...