
4
PBs siPs tips
•
Project must meet local code.
•
Confirm your installation date at least two
weeks prior to requesting on-site assistance.
•
Schedule a preconstruction meeting with
your installation crew (concrete, plumbing,
electrical, siding, roofing, etc.).
•
Inventory materials when you receive them.
•
Check all SIPs for proper cuts and recesses.
•
Double check SIPs sizes and compare to
shop drawings before installation.
•
Engineered details take prescedence over
PBS details.
•
PBS details regarding mastic and SIPs tape
need to be followed.
•
Any changes required at the job site should
be communicated with the technical
representative.
•
Make sure your foundation or floor is level
and square.
•
Fabricate and pre-install dimensional or I-joist
spline material as specified.
•
Review engineering for hold downs if
applicable.
Содержание Floors
Страница 55: ...55...