background image

Installation 

Instructions 

           Page 

5

Ceiling Anchoring

 Truss 

 

     Concrete 

 

    Wood

Truss ceiling
Step 1.

 Loop the braided cable

 

around the truss.

Step 2.

  Run the open end through 

 the 

loop.

Step 3.

  Pull the open end down until 

 

the braided cable tightens 

 

around the truss.

Wood Joist 
Step 1.

  Secure the four (4) ¼” eye 

 

lag screws to the wood joist 

 

in the ceiling. 

Step 2.

  Make sure eye lag screws 

 

are properly secured to the 

 

joist before securing the wire 

 

to the cable locks on the 

 plate.

Step 3.

  Run the open end through 

 

the hole in the eye lag 

 screw.

Step 4.

  Run the open end through 

 the 

loop.

Step 5.

  Pull the open end down until 

 

the braided cable tightens 

 

around the eye lag screw.

Concrete
Step 1

. Determine the mounting 

 location.

Step 2

.  Use a 1/4” masonry drill bit

 

to pre-drill the mounting 

 holes.

Step 3

. Place the concrete anchor 

 

into the pre-drilled hole and 

 

gently tap into place using a 

 

rubber mallet or hammer.

Truss

Loop

Braided Cable

Loop

Eye Lag Hole

Eye Lag Hole

Concrete

Wood Joist

THE PP-FCMA-QL MUST SECURED USING THE SUPPLIED QUICK LOCKS AND 
BRAIDED CABLES.

PP-FCMA-QL

Braided Cable

Содержание PP-FCMA-QL

Страница 1: ...a Avenue Anaheim CA 92806 USA USA and Canada Phone 800 368 9700 Fax 800 832 4888 EUROPE Swallow House Shilton Industrial Estate Shilton Coventry England CV79JY Phone 44 0 2476 614700 Fax 44 0 2476 614...

Страница 2: ...people should perform the assembly procedure Injury and or damage can result from dropping or mishandling the product SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUC...

Страница 3: ...contact Premier Mounts 800 368 9700 Pipe Clamp Qty 4 Installation Tools Phillips Head Screwdriver Wire Cutters Ladder x 3 Eye Lag Screws Qty 4 PP FCMA QL Braided Cable Qty 4 Strands Quick Locks Qty 4...

Страница 4: ...rnings before continuing Step 1 Carefully remove the 24 x 24 or depending on your ceiling configuration the 24 x 48 suspended ceiling tiles Observe the room and the ceiling find the proper location fo...

Страница 5: ...the cable locks on the plate Step 3 Run the open end through the hole in the eye lag screw Step 4 Run the open end through the loop Step 5 Pull the open end down until the braided cable tightens aroun...

Страница 6: ...Step 1 Install the PP FCMA QL plate securely onto the T bar framework with the mounting studs face down according to your installation configuration Ceiling Mounting Studs on the Bottom 24 T Bar Comm...

Страница 7: ...steps 1 through 3 for the remaining pipe clamp installation Attaching the Pipe Clamps PP FCMA QL Step 1 For added security slide two 2 3 4 EMT conduit pipe commercially available through the pipe cla...

Страница 8: ...irectional Input Arrows Feed braided cable into the cable lock see directional input arrows To release the braided cable slide the release pin to disengage the braided cable Release Pin Release Pin Re...

Страница 9: ...4 When adjusting the tension of the weight bearing side of the Quick Lock the cable must be pulled through the Quick Lock until the desired tension is attained Once attained pull the braided cable th...

Страница 10: ...ed base box for further operating instructions Electrical installation should be done in accordance to local codes and regulations Step 1 Cut the tile where the electrical base box is going to be secu...

Страница 11: ...in inches mm Securing Pipe to the PP FCMA QL Step 1 Secure the 1 NPT pipe to the ceiling plate and tighten by using one 1 M5 x 16 Phillips head screw supplied to the plate The M5 x 16 Phillip head sc...

Страница 12: ...NCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUD ING BUT NOT LIMITED TO INABILITY TO USE ITS...

Отзывы: