background image

Page 10 

 

 

 

 

 

 

 

 

 

         Installation Instructions

PP-FCMA-QL

Ceiling Tile

PP-FCMA-QL

M8 Flat 
Washer

M8 x 20mm 
Phillips Head 
Screw

PP-FCMA-QL Adjustments

Step 1.

  Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally.

Please refer to the purchased base box for further operating instructions.

Electrical installation should be done in accordance to local codes and regulations. 

Step 1.

  Cut the tile where the electrical base box is going to be secured. 

Step 2.

  Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure

 

it to the plate. 

Step 3.

  Make all electrical connections at this time.

Electrical Box Installation

Electrical Box 
Cut-out

Electrical Box

Содержание PP-FCMA-QL

Страница 1: ...a Avenue Anaheim CA 92806 USA USA and Canada Phone 800 368 9700 Fax 800 832 4888 EUROPE Swallow House Shilton Industrial Estate Shilton Coventry England CV79JY Phone 44 0 2476 614700 Fax 44 0 2476 614...

Страница 2: ...people should perform the assembly procedure Injury and or damage can result from dropping or mishandling the product SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE ASSEMBLY OF THIS PRODUC...

Страница 3: ...contact Premier Mounts 800 368 9700 Pipe Clamp Qty 4 Installation Tools Phillips Head Screwdriver Wire Cutters Ladder x 3 Eye Lag Screws Qty 4 PP FCMA QL Braided Cable Qty 4 Strands Quick Locks Qty 4...

Страница 4: ...rnings before continuing Step 1 Carefully remove the 24 x 24 or depending on your ceiling configuration the 24 x 48 suspended ceiling tiles Observe the room and the ceiling find the proper location fo...

Страница 5: ...the cable locks on the plate Step 3 Run the open end through the hole in the eye lag screw Step 4 Run the open end through the loop Step 5 Pull the open end down until the braided cable tightens aroun...

Страница 6: ...Step 1 Install the PP FCMA QL plate securely onto the T bar framework with the mounting studs face down according to your installation configuration Ceiling Mounting Studs on the Bottom 24 T Bar Comm...

Страница 7: ...steps 1 through 3 for the remaining pipe clamp installation Attaching the Pipe Clamps PP FCMA QL Step 1 For added security slide two 2 3 4 EMT conduit pipe commercially available through the pipe cla...

Страница 8: ...irectional Input Arrows Feed braided cable into the cable lock see directional input arrows To release the braided cable slide the release pin to disengage the braided cable Release Pin Release Pin Re...

Страница 9: ...4 When adjusting the tension of the weight bearing side of the Quick Lock the cable must be pulled through the Quick Lock until the desired tension is attained Once attained pull the braided cable th...

Страница 10: ...ed base box for further operating instructions Electrical installation should be done in accordance to local codes and regulations Step 1 Cut the tile where the electrical base box is going to be secu...

Страница 11: ...in inches mm Securing Pipe to the PP FCMA QL Step 1 Secure the 1 NPT pipe to the ceiling plate and tighten by using one 1 M5 x 16 Phillips head screw supplied to the plate The M5 x 16 Phillip head sc...

Страница 12: ...NCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE PREMIER MOUNTS IS NOT RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES INCLUD ING BUT NOT LIMITED TO INABILITY TO USE ITS...

Отзывы: