background image

www.mounts.com  |  North America  800.368.9700  | Interna1-714-632-7100

Installation Guide

GB-AVSTOR3

7

Ceiling 

 Framework

24” T-Bar Frame

24” x 48” Ceiling Tile 

Opening 

The replacement 2’ x 2’ 

ceiling tile goes here. 

Figure 3

Figure 4

Figure 2

Figure 1

Quick Lock

6” Excess 1/16” 

Braided Cable 

1/16” Braided Cable To 

Ceiling Attachment 

Ceiling Framework

It is recommended that the following steps be performed by two people.

When adjusting the tension of the weight-bearing side of the Quick Lock, 

the 1/16” braided cable must be pulled through the Quick Lock until the 

desired tension is attained. 

Once the tension has been adjusted, be sure that there a minimum of 

6” of excess 1/16” braided cable on the non-weight bearing side of the 

Quick Lock (Figure 2). 

1)  Lift the ceiling box from the exposed ceiling framework until the 

     ceiling box’s outer lip rests against the bottom of the ceiling 

     framework (Figure 1).

2)  Adjust the 1/16” braided cable tension, but do not over tighten.

4)  Use cable cutters to remove any remaining 1/16” braided cable (optional).

If you installing the GB-AVSTOR3 through a 24” x 48” ceiling tile opening, 

attach a 24” T-bar frame ( commercially available) in the 24” x 48” ceiling tile 

frame for support and place a 2’ x 2’ ceiling tile adjacent to the GB-AVSTOR3 

(Figures 3 and 4).

3)  When you have the desired tension, pull the 1/16” braided cable through 

     the other side of the Quick Lock.

Page 6

Содержание GB-AVSTOR3

Страница 1: ...www mounts com North America 800 368 9700 International 1 714 632 7100 1321 S State College Blvd Fullerton CA 92831 USA Installation Guide GB AVSTOR3...

Страница 2: ...EQUIPMENT AND TOOLS FOR THE ASSEMBLY PROCEDURE TO PREVENT PERSONAL INJURY PREMIER MOUNTS DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY PREMIER MOUNTS PRODUCT FOR PURPOSES OTHER THAN THOSE...

Страница 3: ...Electrical Knockouts Optional Figure 2 Figure 1 Detach the knockout cover after removing its screws 1 and 2 gang electrical knockouts inside the GB AVSTOR3 1 Remove screws from around the desired elec...

Страница 4: ...he hole in an eye lag screw 5 Run the open end through the loop 6 Pull the open end down until the 1 16 braided cable tightens around the eye lag screw 7 Repeat steps 4 6 for the remaining three mount...

Страница 5: ...nd down until the 1 16 braided cable tightens around the truss 4 Repeat steps 1 3 for the remaining three mounting points Please follow the steps below in numerical order 1 2 3 and 4 to correctly inst...

Страница 6: ...the tension has been adjusted be sure that there a minimum of 6 of excess 1 16 braided cable on the non weight bearing side of the Quick Lock Figure 2 1 Lift the ceiling box from the exposed ceiling...

Страница 7: ...tie down and cut off any excess zip tie 1 Insert four 4 M5 x 8mm Phillips head screws loosely into the outer holes inside the GB AVSTOR3 Figure 1 2 Place the mounting tray into the middle section of t...

Страница 8: ...AVSTOR3 10 11 1 Re attach the ceiling box lid to the ceiling box 2 Swing the ceiling box lid up into place 1 Hold the lid in place 2 Use a key supplied to lock the lid in place 3 Do not release the ce...

Страница 9: ...proper installation modification use or misuse of its products NOTWITHSTANDING ANYTHING TO THE CONTRARY IN THIS WARRANTY THIS WARRANTY IS LIMITED TO FIVE YEARS FROM THE DATE OF PURCHASE IN THE EVENT T...

Отзывы: