C776i Stairclimber
Page 48
3.
Disconnect the hand held heart rate (HHHR) connectors. Remove the vertical handlebar
assembly.
4.
Set the replacement vertical handlebar assembly on the left and right handlebars as shown
in Diagram 7.9. Connect the hand held heart rate (HHHR) connectors.
5.
While rotating the vertical handlebar assembly into its mounting position, feed the hand held
heart rate cable into the access hole in the upright column.
6.
Hand start but do not tighten the two handlebar clamp bolts removed in step 2. Hand start
but do not tighten the two vertical handlebar bolts removed in step 1.
7.
Verify that both the left and right hand handlebars are fully inserted in the handlebar clamp.
Securely tighten both handlebar clamp nuts. Then tighten both vertical handlebar bolts.