Model PD655 Large Display Process Meter
Instruction Manual
17
SETUP AND PROGRAMMING
Overview
To set up and program the meter, it is necessary to disassemble the Display
Board. See disassembling instructions in the next pages.
Setting up and programming the meter involves four basic steps:
1. Jumper Configuration (Page 19)
a. Input selection and lockout jumpers
b. Relay
acknowledge
enable
c. Fail-safe operation of relays
2. Power Selection (Page20)
a. Changing to 230 VAC power if needed. Factory default is 115 VAC.
b. Labeling meter for input power: 115 VAC, 230 VAC, or 24 VDC
3. Connections (Page 21)
a. Power
b. Input
signal
c. Enter,
acknowledgement, and reset total
d. Relays
e. 4-20 mA output
4. Programming (Page 28)
a. Basic
meter
b. Process/rate
meter
c. Totalizer
d. Batch
controller
e. Relays
f.
4-20 mA output
g. Lockout and display selection
Programmed Parameter Settings
To simplify programming, write down the desired programming values prior to
attempting to program the meter. The
Programmed Parameter Settings
form
located at the back of this manual provides a convenient method to record the
user settings; it also provides the factory setting for most of the programmable
parameters.