
Model PD6060 Dual-Input Process Meter
Instruction Manual
26
SETUP AND PROGRAMMING
The meter is factory calibrated prior to shipment to read in milliamps
and volts, depending on the input selection. The calibration equipment
is certified to NIST standards.
Overview
There are no jumpers to set for the meter input selection.
Setup and programming is done through the front panel buttons.
After power and input signal connections have been completed and
verified, apply power to the meter.
Содержание PD6060
Страница 45: ...Model PD6060 Dual Input Process Meter Instruction Manual 45 Setting the Relay Assignment asSign ...
Страница 52: ...Model PD6060 Dual Input Process Meter Instruction Manual 52 Pump Alternation Control Operation ...
Страница 94: ...Model PD6060 Dual Input Process Meter Instruction Manual 94 This Page Intentionally Left Blank ...