background image

AWP 3260 CWH 

Installation Instructions

Hydro-massage Bathtub - UL 1795

INSTALLATION WITH MOLDED ACRYLIC OR SCREW 

ON TILE  FLANGE

1 Drill through flange at the framing studs.

2 Screw flange to framing studs.

3 For units equipped with the acrylic flange, bring the 
sheathing to the top of the flange and seal the joint. (See 

diagram A)

4 For units equipped with the screw on tile flange, it 
is necessary to caulk between the flange and tub after 
attaching the flange to the framing. Allow the sealant to dry, 
then bring the sheathing over the flange. (See diagram B)

5 Tile over sheathing and/or flange, sealing all joints between 

the tub and tile.

6 Insert horizontal edge of skirt into top brackets. Once 

skirt is plumb, scribe a line on the floor parallel to bottom 

of skirt.

7 Mount (3) lower braces to floor approximately 1/4” 

behind line (1 center of skirt - 1 on each end of the toe 
kick.)

8 Lift skirt until seam between tub and skirt is minimal, 
screw (5) into place.

9 Place decorative caps over screw heads.
NOTE: Caulking may be used to completely conceal seam 
between tub and skirt. In some cases it may be necessary to 
widen the recess in the top brackets, if so, use a hand saw 
and cut in 1/8” increments. DO NOT deepen recess.

OPERATING INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS: Please refer to 
important safety instructions included on the cover of this 
manual before operating or using the whirlpool bath.

Maximum soaking temperature should not exceed 104 

degrees (F) 40 degrees (C). Consult a physician for specific 
temperature and length of use specifications, depending on 

health considerations.

Children, elderly or infirm bathers must remain under close 

supervision.

Keep hair away from suction fitting to prevent entrapment.

Do not use while under the influence of alcohol or drugs.

INSTALLATION WITH MOLDED ACRYLIC OR SCREW ON TILE FLANGE

1)  Drill through flange at the framing studs.

2)  Screw flange to framing studs.
3)  For units equipped with the acrylic flange, bring the sheathing to the top of the flange and seal      

the joint. (See diagram A).

4)  For units equipped with the screw on tile flange, it is necessary to caulk between the flange and

tub after attaching the flange to the framing. Allow the sealant to dry, then bring the sheathing

over the flange. (See diagram B)

5)  Tile over sheathing and/or flange, sealing all joints between the tub and tile.

6

UPPER BRACKETS

LOWER BRACES

FRONT VIEW

BACK VIEW

DECORATIVE SCREW CAP

TOP BRACKET RECESS

LOWER BRACE

RECESSED TOE KICK

MOUNTING

SCREW

1)  Insert horizontal edge of skirt into top brackets. Once skirt is plumb, scribe a line on the floor

parallel to bottom of skirt.

2)  Mount (3) lower braces to floor approximately 1/4” behind line (1 center of skirt - 1 on each

end of the toe kick.)

3)  Lift skirt until seam between tub and skirt is minimal, screw (5) into place.
4)  Place decorative caps over screw heads.
NOTE: Caulking may be used to completely conceal seam between tub and skirt.

In some cases it may be necessary to widen the recess in the top brackets, if so,

use a hand saw and cut in 1/8” increments. DO NOT deepen recess.

Diagram A

Diagram B

Отзывы: