6
5. INSTALLATION( For reference only)
●
RIGGING
Before moving the unit, lock the adjusting knob.
Take 2 clamps and the safety cord out from the package and mount 2 clamps on the underside of fixture with 2 retainers attached
to each clamp. Hang the fixture on the structure and fasten the screws attached to each clamp. (See the
WARNING
on the
underside of the base as shown above)
To pass the SAFETY CORD through the HOLES for safety!
Always ensure that the
projector is firmly anchored to avoid vibration and slipping whilst functioning. Always ensure that the structure that you are going
to mount the projector to is secure and strong enough to support the weight of a unit.
WARNING:
●
The projector MUST be lifted or carried by the HANDLES instead of clamps.
●
.For safety the safety cord should afford 10 times the Projector’s weight.
●
POWER CONNECTION
Connect the power cord as follows:
L (live) =brown
E (earth) =yellow/green
N (neutral) =blue
Note: Before power connection, please ensure the power supplied must match what the nameplate says.
●
The earth wire(yellow/green) must be connected to the ground. And electrical connection must be in
accordance with the standards concerned.
●
If any questions about the electrical installation, do not continue but consult a qualified electrician.
Clamp
Clamp
Safety Cord
Handle
Adjusting Knob
Warning: please run
the safety cord through
the arm for safety.
Содержание ARC LED 372
Страница 16: ...16 11 CIRCUITDIAGRAMAND PCB CONNECTIONS CIRCUITDIAGRAM...
Страница 17: ...17 PCB CONNECTIONS...