33
Case Show:
This case diagram is from the actual case diagram of Douala, Cameroon. The field prospecting is
completely consistent with drilling result. Well position was designed with 13 walls 45m deep.
After well completion, there is 9 m3 water per hour, to which client was very satisfield.