PPS71 Geothermal Memory Gauge with GRD
User Manual
Pioneer Petrotech Services Inc.
1-888-PP-GAUGE (774-2843)
www.pioneerps.com
Page 15
4.5
Filling the spinner up with hydraulic oil
If a spinner is available, filling it up with oil is necessary.
Fig. 28
Fig. 29
Now, your gauge is ready for an operation!
Step 1
Remove one of the plugs (Fig. 28)
using an Alan key (size 5/32” )
Step 2
Purge the spinner with hydraulic oil
using a handpump oiler (Fig. 29)
Step 3
Re-install the oil plug
Max. Downhole operation time (Flask tube is available):
4 hours at 350
°
C or
6 hours at 300
°
C or
8 hours at 250
°
C or
10 hours at 200
°
C or
12 hours at 180ºC
You MUST wait at least 30mins until the tool is cool enough to open the
battery housing. This will prevent damage to the threads.