background image

10

11

Step 6: 

Position the automation vertically on the door column and weld the mounting 

brackets on the column, respecting the measurements in the figure below.

Step 7: 

Attach the drive lever to the pin of the drive nut of the operator.

Step 8: 

Weld the drive lever on the gate leaf, keeping the distance of 250 mm 

between the center of the gate shaft and the center of the lever’s turning point.

110

mm

270 mm

TRIGGERING
NUT

TRACTION
LEVER

LEVER
TURNING POINT

250 mm

GATE AXIS

Step 9: 

With the gate closed, maintain a 50 mm tilt on the drive lever, respecting 

a distance from the center of the turning point of the drive lever and the center of 

the drive nut pin.

Step 10:

 Still with the gate closed, adjust the closing stop, so that the rubber of 

the gate cushion the drive nut in the closing of the gate. Then, with the gate open, 

perform the same procedure for the opening stop.

ANALOGIC LIMIT SWITCH INSTALLATION

Step 1: 

Position the limit switch magnet into the drive nut housing. Position the 

opening and closing limit switches so that they activate when the gate leaf com-

pletes its movement. Connect the limit switch to the control unit.

Step 2: 

Place the protective rubber of the wires into the reed housing, traversing 

the entire rail profile.

PIN CENTER OF 
THE TRIGGERING
NUT

50 mm

TURNING POINT

OF THE DRIVE 

LEVER

TRIGGERING
NUT

REED

MAGNET

Содержание BV POTENZA PREDIAL CUSTOM

Страница 1: ...ion manual BV POTENZA PREDIAL Technical Manual P30705 05 2022 Rev 1 Made by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado 3526 Distrito Industrial Gar a SP CEP 1...

Страница 2: ...ith that required on the equipment iden tification label Do not connect the electrical grid until ins tallation maintenance is complete Always make electrical connections to the control unit with the...

Страница 3: ...7 m min MANEUVERS 30 cycles h 50 cycles h 30 cycles h 50 cycles h DEGREE OF PROTECTION IPX4 IPX4 IPX4 IPX4 RAIL Aluminum Steel Aluminum Steel Aluminum Steel Aluminum Steel TEMPERATURE RANGE 5 C 50 C 5...

Страница 4: ...s stationary the gate will be satisfactorily balanced This equilibrium condition must occur for approximately 80 of the stroke and imbalance near the extremes of the stroke end is admissible Remove an...

Страница 5: ...af Step 2 Remove the top rail cover and install the securing brackets on the opposite side to the drive nut pin ARTICULATING ARM GATE LEAF HALF OF GATE LEAF GATE AXIS Step 3 Insert the closing stop wi...

Страница 6: ...e center of the turning point of the drive lever and the center of the drive nut pin Step 10 Still with the gate closed adjust the closing stop so that the rubber of the gate cushion the drive nut in...

Страница 7: ...art does not move A Power off B Open burned fuse C Locked gate D Defective limit switch A Make sure that the power supply is connected correctly B Replace fuse with the same specification C Make sure...

Отзывы: