G3L-850-160 MCPA
Initial Start-up and Operating Procedures
044-05236 Rev A
3-3
Table 3-3 Initial Start-up Procedure
Step
Action
1
Verify all system input and output cables are properly connected.
2
27 VDC (+/- 1 VDC) supply is available.
3
Set MCPA OFF/ON/RESET switch to ON (center) position.
4
Allow MCPA to warm-up for a minimum of two minutes before taking power readings.