17
EBM model
EBM modular installation steps are same as UPS as above, Pay attention to this installation:
1.
EBM modular must be installed on the lower level of the UPS {as shown below).
2.
2 EBMs are required for RT 15/20kVA UPS, each EBM with a height of 3U; therefore, 6U
installation space is required.
Tower installation
UPS model
Screw the tower foot to UPS
:
The LCD of this UPS modular has gravity sensing, the
vision window can automatically adjust the display direction {as below).
EBM model
1.
Place EBM modular to UPS's right side and align with front-panel.
2.
Screw the UPS's tower foot: one is to UPS's side, another one to EBM's side {as above)
2 EBMs are required for RT 15/20kVA UPS, please keep an enough space for installation.