background image

Storage & Maintenance

The  unit  contains no user-serviceable parts. If the battery service life
(3~5  years  at  25°C  ambient  temperature)  has  been  exceeded,  the

batteries must be replaced. In this case, please contact your dealer.

Storage 

Before  storing,  charge  the  unit  4  hours.  Store  the  unit  covered  and 
upright in a cool, dry location. During storage, recharge the battery in 
accordance with the following table: 
Storage Temperature 

Recharge Frequency 

Charging Duration 

-25°C - 40°C

Every 3 months 

1-2 hours

40°C - 45°C 

Every 2 months 

1-2 hours

Be sure to deliver the spent battery to a recycling facility or ship 

it to your dealer in the replacement battery packing material. 

Installation and Setup

NOTE: 

Before installation, please inspect the unit. Be sure that nothing inside

 

the package is damaged. Please keep the original package in a safe place for

 

future use

CAUTION – A battery can present a risk of electrical shock and high short

 

circuit current.   The following precaution should be observed when

 

working on batteries:

1.

Remove watches, rings, or other metal objects.

2.

Use tools with insulated handles.

3.

Wear rubber gloves and boots.

4.

Do not lay tools or metal parts on top of batteries.

5.

Disconnect charging source prior to connecting or disconnecting

 

battery terminals.

Do not plug or unplug the battery connector if UPS works in DC

(discharging) mode. 

Содержание BP A36T-6x9Ah

Страница 1: ...User Manual Battery Pack ...

Страница 2: ...ironment The warranty for this battery bank will be void if water or other liquid is spilled or poured directly onto the battery box Similarly we do not warrant any damage to the battery box if foreign objects are deliberately or accidentally inserted into the battery box enclosure The battery will discharge naturally if the system is unused for a period of time It should be recharged every 2 3 mo...

Страница 3: ... a recycling facility or ship it to your dealer in the replacement battery packing material Installation and Setup NOTE Before installation please inspect the unit Be sure that nothing inside the package is damaged Please keep the original package in a safe place for future use CAUTION A battery can present a risk of electrical shock and high short circuit current The following precaution should b...

Страница 4: ...e batteries 12V 7Ah or 12V 9Ah and check the date code it s necessary to use batteries with same date code in a UPS unit Serial connect batteries with three black wires in 450 280 150 mm length Slip the end of black wire with 280mm length into the tube 2 Connect red wire with 380mm length to battery and slip red wire into the tube NOTE This will prevent short circuit from direct contact of termina...

Страница 5: ...s with three black wires in 450 280 150 mm length Slip the end of black wire with 280mm length into the tube 6 Connect red wire with 380mm length to battery and slip red wire into the tube NOTE This will prevent short circuit from direct contact of terminal 7 Put the three batteries in order as shown in chart Hint Install the left one and keep battery terminal heading the bottom Then install the m...

Отзывы: