ACE Series – Owner’s Manual – 03/17/09
Step 10.
Slide the batteries into the UPS. Allow enough working space to make the final wiring connections in
step below.
Step 11.
Final connections:
x
600 & 1000 VA: Connect the Black Wire as shown in diagram above.
x
1500 & 2000 VA: Connect the Red Wire as shown in diagrams above.
Step 12.
Install Metal Battery cover plate: Install metal plate with Phillips-head screws.
Step 13.
Re-Install Left front cover first by using the Phillips-head screws. Put the Right front cover on the
Right side first; press the left side into the UPS.
Step 14.
Battery replacement complete.