INSTRUCTIONS PL600H/PL1000H
16
4) Final Checks and Start Up
4.1 Initial Checks
4.1.1 Design of PL600H/PL1000H control unit
3.4 Power Supply Connections
Please kindly notice that the operation of power connection should be carried out by a qualified electrician with
following steps:
1). Make sure the gearmotor is not connected to the power supply before the installation is done.
2). Make sure all the wires are firmly connected.
3). Supply the gearmotor with the power.
If the Led display is in normal performing refer to “4.2.1”, you can control the gate by either transmitters or the button
on the board: “UP”-clockwise moving, “SET”- stop and “DOWN”- Counterclockwise moving.
6
6
7
3
4
9
6
8
9
9
6
9
10
11
LED1 Photocells
LED2 Photocells
LED3 RF Learning
ANT
GND
RF Learn (SW1)
LED Display
UP (SW3)
SET (SW4)
DOWN (SW5)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
Green Box Socket
Inside the Cover
Содержание PL1000H
Страница 1: ...FOR RESIDENTIAL USER MANUAL SLIDING GATE OPENERS PL600H PL1000H 24V DC MOTOR ...
Страница 2: ......
Страница 27: ......
Страница 28: ...34100 065 02 C Powertech Automation Inc ...