10
11. Locate the upper chute crank (E) in the part bag. Remove the screw (EE) and nut (DD) from the
upper chute crank (E) using a Phillips screwdriver and wrench.
12. Slide the upper chute crank (E) into the lower chute crank (F), aligning the screw holes.
13. Tighten the screw (EE) into the aligned holes.
14. Remove the screw (HH) on the discharge chute base (R) with the screwdriver.
15. Insert the chute crank (F) into the hole on the discharge chute base (R). Insert the screw (HH)
previously removed and tighten it with the screwdriver.
16. Remove the washer ( FF) and nut (GG)from the eye bolt with rubber grommet (Q) found on the
upper chute crank (E).
17. Position the chute crank (E) so that the eye bolt with rubber grommet (Q) inserts into the center
hole of the middle frame (B). Secure with washer (FF) and nut(GG).
Содержание DB2418
Страница 2: ......
Страница 16: ...16 EXPLODED VIEW AND PARTS LIST ...