PowerMetrix PowerMaster MTA15Z Скачать руководство пользователя страница 4

 

Rev: 1.1 

 

Page 4 of 13 

General Information 

 

Product Introduction 

The MTA15Z is a self-contained accessory to the PowerMaster

®

 analyzer.  This accessory 

accommodates testing of any ANSI socket-based meter using a load provided by the 
PowerMaster

®

.  The MTA15Z includes a zero-insertion force (ZIF) socket that is automatically 

configured by the PowerMaster

®

and requires no jumpers for testing.  For mechanical meters, the 

user can pull the supplied pins for the lid, rotate the case upright, and test appropriately.   

Currents are injected via the PowerMaster

®

 by the 6mm terminated lead set.  Voltages are 

injected using the standard voltage lead set, and are fused for each phase on the MTA15Z.   

Once the service type is selected in the PowerMaster

®

, the user will select a Phantom Load 

Setup to provide the test.  Results are saved as normal in the PowerMaster

®

 and will be 

downloaded using the Meter Site Manager 2 software. 

 

Included Accessories 

Qty. 

Part # 

Description 

10-340-3309 

RS232 Communication Cable 

10-340-0066 

Power Cable 

22-900-2022 

Pull pin for lid 

10-340-0068 

AC power cable (N. America) 

10-340-0069 

AC power supply (100-240V) 

10-340-4096G 

Green safety ground lead 

50-950-0006 

Green alligator clip 

 

Spare Parts 

Qty. 

Part # 

Description 

34-100-0144 

KLKR Fuse 0.5A, 600V, slow acting 

22-900-2022 

Pull pin for lid 

 

Safety

 

Operation of the PowerMaster

®

 and the supplied accessories and adapters can present the user 

to potentially hazardous conditions.  Please follow all required safety procedures set forth by the 
user’s safety organization within the company.  If no safety organization exists, please follow all 
applicable OSHA rules and standards for PPE (Person Protective Equipment) when working in 
high voltage and low voltage environments.   This equipment should be used by trained and 
qualified personnel ONLY.   

 

 

 

Содержание PowerMaster MTA15Z

Страница 1: ...Rev 1 0 Page 1 of 13 MTA15Z PowerMaster Accessory Product Manual Revision 1 1...

Страница 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose TEC shall not be liable for errors omissions or inconsistencies which may be contained herein or for inc...

Страница 3: ...Rev 1 1 Page 3 of 13 Table of Contents General Information 4 1 Setting Up 6 2 PowerMaster Procedure 9 2 1 With Site Selected 9 2 2 With No Site Selected Component Test 11 3 Error Messages 12...

Страница 4: ...re saved as normal in the PowerMaster and will be downloaded using the Meter Site Manager 2 software Included Accessories Qty Part Description 1 10 340 3309 RS232 Communication Cable 1 10 340 0066 Pow...

Страница 5: ...slow acting Case Pelican 1450 Dimensions 14 6 x 10 x 6 Weight 14 8 lbs 6 7 kg Warranty 1 year does not include fuses Technical Support For technical support please contact the factory at 865 218 5838...

Страница 6: ...Ground Aux Power cable to the PowerMaster 2 Remove all alligator clips from the ends 3 Separate the MEASURE and RETURN from the stackable banana jacks 4 Insert the cables labeled MEASURE into the VOL...

Страница 7: ...1 14 15 16 17 29 36 39 46 76 Removal To remove the probes push into the receptacle gently and now the probe will unlock for removal Communication and Power Connections 1 Connect the DB9 cable to RS232...

Страница 8: ...ge of the lid 2 Remove the lid and place aside 3 Insert the meter into the appropriate socket 4 Rotate the MTA15Z in a vertical position so the case stands upright 5 For pulse detection use a Manual P...

Страница 9: ...2 to create a new site STEP 3 In the Site Editor screen enter the Site ID meter form service and service type according to the Jumper Configuration Diagram STEP 4 Press F2 to select a meter in the dat...

Страница 10: ...age 10 of 13 STEP 10 Select the setup then press F6 to continue STEP 11 After stabilization is complete and pulses are detected press F6 to continue STEP 12 After the test is complete press F6 to save...

Страница 11: ...t the Meter Model and desired Service Type STEP 4 Enter the serial number MFG SN and alternatively the Kt value Press F6 to continue STEP 5 Hook up pulse pickup to meter AUX DIG on PowerMaster STEP 6...

Страница 12: ...ervice type file that ends with M The PowerMaster cannot communicate with the MTA15Z Verify the following 1 Verify cables are connected according to Section 1 Setting Up Communication and Power Connec...

Страница 13: ...cannot stabilize the currents and or voltages Attempt the following 1 Verify the green safety ground lead is connected to true earth 2 Verify the current leads are connected according to Section 1 Set...

Отзывы: