
© 2018 Powermat Technologies Ltd. All rights reserved.
8
Charging Spot 4.0 Installation
1
Bottom unit installation
Connect bottom chassis:
Place and hold the bottom chassis unit on the marked location under the table.
Use 4 screws to secure the chassis to the table (Figure 3).
Make sure chassis orientation fits DC wire direction (Figure 4).
When installing on a non-wooden surface such as Granit or glass, use glue to
attach the bottom chassis to the surface (replacing the screws) (Figure 5 & 6).
Locate:
Before you start: The following describes installation options where the bottom unit is
fixed first. If you wish to start your installation by fixing the top unit first, go to:
https://www.powermat.com/installation/
to watch installation video.
Measure and mark the exact position to place the bottom unit (Figure 1).
If you are installing more then one unit on the table, make sure to use a tape
measure to assure all units are positioned at the same distance from table edge.
Assure 1” clearance from table metal objects (figure 2).
(!) Important note:
Prior to installing bottom unit chassis, make sure power supply is
disconnected from the AC power. Avoid touching the electronics unit during
installation.
Figure 1: Measure and mark bottom unit location
Figure 2: Assure clearance from metal objects
Figure 3: Connecting bottom chassis
Figure 4: Bottom chassis orientation
Figure 6: Apply glue in recess
Figure 5: Glue application area