background image

21

BL

Y

BK

WH

Not Used

NOTE: TWIST LEADS APPROX. 

   6 TURNS PER FOOT

REVERSING LOOP CONNECTION

TO

DRIVEWAY 

LOOP

BR

GY

GR

V

OR

R

P

BK

BL

Y

WH

V

OR

Not Used

TO

DRIVEWAY 

LOOP

NOTE: TWIST LEADS APPROX. 

   6 TURNS PER FOOT

EXIT LOOP CONNECTION

R

BR

GY

GR

P

3.  Leaving enough wire for the lead-in,  insert the specified number of turns of wire in the 

cut grooves (See chart).  

 

CAUTION: Be careful not to damage the wire insulation during installation.

4.  After completing the required number of loop turns, twist the ends together at the rate 

of 6 turns per foot to form the lead-in.

5.  Seal the lead-in wire in the conduit to prevent moisture seepage into the conduit.

6.  Fill over the loop wires in the groove with a recommended loop sealant. Contact your 

distributor for available sealants.

7.  Mount the loop detector in the operator and connect the wire loop.

8.  Connect loop detector to the control board as shown in the following diagrams:

A

7 8 9 10

B

A

2 3 4 5

B

Содержание rsw

Страница 1: ...GTH X 10 1 2 WIDTH 2 O D PIPE BY OTHERS INSTALLATION AND OWNER S MANUAL MODEL RSW Swing Gate Operator UL 325 and UL 991 Listed READ THIS MANUAL CAREFULLY BEFORE INSTALLATION OR USE SAVE THESE INSTRUCT...

Страница 2: ...14 Electrical Connections 15 Left Hand Right Hand Conversion 16 Connection of a 3 Button Station 16 Limit Adjustment 17 Master Slave Installation 18 Timer to Close 18 Accessory Connections Connection...

Страница 3: ...provide an overview of the importance of safe design installation and use Warnings are identified with the symbol This symbol will identify some of the conditions that can result in serious injury or...

Страница 4: ...board must learn what the monitored device is To have the board learn the monitored device perform the following steps 1 With the power off hold both the open and close limit simultaneously 2 Power up...

Страница 5: ...family units hotel garages retail store or other building servicing the general public CLASS III INDUSTRIAL LIMITED ACCESS VEHICULAR GATE OPERATOR A vehicular gate operator or system intended for use...

Страница 6: ...owing diagram Figure 1 5 Design the gate system so a person cannot reach over under around or through the gate to operate any controls Never place controls on the gate operator itself THIS GATE SYSTEM...

Страница 7: ...g the correct type of safety equipment consult the factory 6 Review the operation of the unit and become familiar with the manual operation procedure and safety features of the system 7 You must insta...

Страница 8: ...in sight of the gate opening AFTER INSTALLATION You are responsible for ensuring that the end user understands the basic operations and safety systems of the unit INCLUDING THE MANUAL OPERATION PROCED...

Страница 9: ...gate 3 DO NOT allow children to play near your gate or to operate the gate 4 DO NOT operate your gate system unless you can see it when the gate moves 5 Be sure a pushbutton or key switch has been ins...

Страница 10: ...ng a rigid object or when a non contact sensor is activated If these functions are observed to operate improperly discontinue use and have it serviced immediately 11 You are responsible for ensuring t...

Страница 11: ...e sure you know how to properly use this feature To disengage operator follow the procedure in Figure 2 FIGURE 3 LEFT HAND INSTALLATION FENCE FENCE OPERATOR OPERATOR HINGE HINGE GATE GATE RIGHT HAND I...

Страница 12: ...r to operator installation Note Distance between mounting posts and relative location to gate is very important Operator must be installed perpendicular to the fence GATE HINGE GROUND LEVEL 17 3 8 21...

Страница 13: ...nd connecting rod must be straight in line FIGURE 7 FIGURE 8 NOTE TO DISCONNECT OPERATOR FOR MANUAL OPERATION REMOVE HANDKNOBS AND SEPARATE CONTROL ARM EXTENSION FROM CONTROL ARM HAND KNOBS FOR MANUAL...

Страница 14: ...esired open and closed gate position have been achieved place gate in the fully closed position and remove control arm extension from control arm See Figure 6 9 Remove control arm from operator drive...

Страница 15: ...ed in accordance with N E C and local codes NOTE In order to properly run and check the operator at various stages during the setup procedure it is suggested that a three button control station be con...

Страница 16: ...0 1 Connect a wire from the COMMON connection of the control station to Terminal 5 2 Connect a second wire from the OPEN button of the control station to Terminal 6 3 Connect a third wire from the CLO...

Страница 17: ...E button and stop gate in mid travel with STOP button 5 Repeat procedure until desired open setting is obtained CLOSE LIMIT SWITCH ADJUSTMENT 1 Press CLOSE button on control station Gate should stop b...

Страница 18: ...SLAVE POSITION ON MASTER POSITION OFF JUMPER JUMPER ON SLAVE SLAVE ON FIGURE 12 MASTER SLAVE 15 14 13 12 11 9 8 7 6 5 4 3 2 1 10 16 17 18 15 14 13 12 11 9 8 7 6 5 4 3 2 1 10 16 17 18 TIMER TO CLOSE OP...

Страница 19: ...ght depicts the typical loop options for a Swing Gate installation 1 The Exit Loop provides a signal to open the gate when a vehicle enters the loop zone 2 The Reversing Loop protects a vehicle in the...

Страница 20: ...special installations Call 1 800 243 4476 LOOP SIZE OF TURNS LOOP WIRE LENGTH FT 4 X 4 4 64 4 X 6 4 80 4 X 8 3 72 4 X 10 3 84 4 X 12 3 96 4 X 14 3 108 4 X 16 3 120 4 X 18 3 132 4 X 20 3 144 4 X 22 3 1...

Страница 21: ...reful not to damage the wire insulation during installation 4 After completing the required number of loop turns twist the ends together at the rate of 6 turns per foot to form the lead in 5 Seal the...

Страница 22: ...witch the gate will stop and sound a warning signal A constant pressure control will then be needed to start the gate This sensing system has sensitivity adjustments located on the printed circuit boa...

Страница 23: ...ts when the gate is moving 1 Install electric edge sensors in locations shown on the right NOTE A separate pedestrian gate must be installed if there is no other entry access but the vehicular gate Ou...

Страница 24: ...ON 1 Install photoelectric cell as close to FULL OPEN and FULL CLOSED position of gate as possible 2 Photocells should be installed across the gate opening and behind the gate at least 10 inches above...

Страница 25: ...for proper operation by blocking the beam across the gate opening while the gate is running closed NOTE The gate should STOP AND REVERSE a short distance and then STOP 7 Test the OPEN OBSTRUCTION SEN...

Страница 26: ...Notes...

Страница 27: ...ar period provided that product has been registered A one year warranty applies if product has not been registered If any part is found to be defective during this period new parts will be furnished f...

Страница 28: ...wer net faqs Call us toll free 1 800 243 4476 Email us PMtech VEpower net www facebook com PowerMasterOperators REV 2017 1024 Scan QR Code with your Smart phone to find us on the web WWW VEPOWER NET M...

Отзывы: