10
Step 1:
. Take the machine from the package
,
put on the flat floor. Connect the signal wire
which between the base frame and upright post, then fix the upright post (right) on
the main frame with 4pcs M8*40 Allen socket full thread screws and 4 pcs M8*15 Allen
C.K.S full thread screw .
Step 2:
. Connect the console signal wire with the upright post signal wire, put the
console on the upright post, using 4pcs screw (M8*15) to fix the monitor on the upright
post(left and right).(Please be caution do not clamp the signal wire )
ASSEMBLY INSTRUCTIONS