![Powerhorse 166112 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/powerhorse/166112/166112_owners-manual_1589479014.webp)
Installation/Initial & Set-Up
14
There are a number of important steps required to set up your generator for initial use. These
steps are:
Steps for Installation / Initial Set-Up
1.
Unpacking & delivery inspection.
2.
Planning the power load to stay within the generator’s rated
capacity.
3.
Setting up generator for the type of power generation you need:
a.
portable power source, or
b.
connected to a building as a back-up power source.
4.
Selecting a site for using the generator.
5.
Grounding.
6.
Battery installation (electric start models only).
Each of these steps is discussed in detail below:
1. Unpacking & Delivery Inspection
You should inspect the generator immediately after you receive delivery.
See the “Machine Component Identification” section of this manual for a
diagram of the generator and its components.
If you have
missing
components, contact Product Support at 1-866-443-2576.
If you have
damaged
components, contact the freight company that delivered the unit and file a
claim.
2. Planning the Power Load
Plan your power load so that you do not exceed the generator’s rated capacity.
See the “Power Load Planning & Management” section of this manual to review how to plan and
manage power loads for the generator.
Содержание 166112
Страница 2: ...Hazard Signal Word Definitions 2...
Страница 8: ...Safety Labels Locations 8 Part 782633 Part 782930 Part 782630 1 of 2 Part 782630 2 of 2...
Страница 48: ...Electrical Diagram 48...
Страница 49: ...166112 Engine Parts Rev F 2 49...
Страница 52: ...166112 Generator Parts Rev F 2 52...
Страница 55: ...Wheel Kit Assembly 55...
Страница 57: ...57 This page left intentionally blank...
Страница 58: ...58 Distributed by Northern Tool Equipment Co 2800 SouthCross Drive West P O Box 1499 Burnsville MN 55337 0499...