![PowerFleet LV710 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/powerfleet/lv710/lv710_installation-manual_1589410004.webp)
LV710 Freight Camera - Dry Van Swing Door Installation
Revised: 05/23/19 4
Standard Installation:
1.
Confirm curbside door thickness is ≤ .75”.
2.
Assemble installation hole template.
3.
On the exterior of the curbside door, next to inner locking rod, mark a location 50” up from the
trailer floor.
Measure and mark location 50” up from trailer floor
Содержание LV710
Страница 12: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 12 Lens centered in hole...
Страница 13: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 13 Install thin black rubber washer...
Страница 14: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 14 Hand tighten black plastic nut...
Страница 15: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 15 Tighten nut turn past hand tight...
Страница 16: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 16 Remove clear protective film from lens...
Страница 18: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 18 14 Install thread forming screws...
Страница 19: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 19 Completed installation...
Страница 24: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 24 Remove sheathing disc...
Страница 34: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 34 Tighten nut turn past hand tight...
Страница 35: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 35 Remove clear protective film from lens...
Страница 37: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 37 Install thread forming screws...
Страница 38: ...LV710 Freight Camera Dry Van Swing Door Installation Revised 05 23 19 38 Completed installation...