background image

CONTENTS

Introduction 2 

Operating Specifications 

Working Envelope Diagram 

Do’s and Don’ts 

Primary Components 

Operating Procedures  (Incl. Emergency Operation)  

6-8 

Maintenance Procedures 

9-11

Castor Safety and Maintenance

 12

Transportation, Towing, Lifting and Manoeuvring 

13-14

Storage 15

Key Spare Parts 

16 

Warranty Terms 

17

Decal Placement 

18-21

Wind Rated Chassis - Operating Specifications  Appendix ‘A’

Wind Rated Chassis - Operating and 
Safety Instructions 

Appendix ‘B’

Wind Rated Chassis. Additional 
Maintenance Instructions 

Appendix ‘C’

Machines with ATEX Certification 

Appendix ‘D

CONTENTS

2

INTRODUCTION

The Power Tower Ecolift is a simple, safe and efficient alternative to step-
ladders, platform/podium steps and small scaffold towers. The Ecolift does 
not require batteries (or charging) or connection to an electricity supply. It 
works by a unique, patented stored power mechanism which enables the 
platform to be elevated with very little effort by the operator.

The Ecolift is designed for working internally on flat, level surfaces, 
and as it has no batteries, electric motor, electrics or hydraulics it is very 
ecologically friendly. It is ideally suited to working in a very wide range of 
applications from the very ‘clean’ environments of hospitals, food and drinks 
production facilities, pharmaceuticals and retail, to facilities maintenance, 
shop-fitting and indoor construction and even on zone 1/21 hazardous 
areas (If ATEX option is fitted).

The Ecolift is suitable for any application provided it is used within its 
specified operating parameters.  If used for applications such as sand 
blasting, welding, paint spraying or with any other hazardous materials, 
measures must be taken to ensure the Ecolift does not become damaged in 
any way which may impair safety, or reliability.  Additional protection for the 
operator may be required in some cases, which is the responsibility of the 
operator and/or the operator’s employer.

The purpose of this manual is to provide essential basic information required 
to operate and maintain the Ecolift.

This is not a workshop manual. Please contact the manufacturer or their 
agent for specific operation or maintenance information if in doubt.

The health and safety of the operator or maintenance technician is the 
responsibility of the individual and/or their employer and not Power 
Towers Ltd.

Courtesy of Crane.Market 

Содержание EcoLift

Страница 1: ...Operating and Maintenance Manual www powertowers com 4 2m Non Powered Powered Access Courtesy of Crane Market...

Страница 2: ...electrics or hydraulics it is very ecologically friendly It is ideally suited to working in a very wide range of applications from the very clean environments of hospitals food and drinks production...

Страница 3: ...kg 1 person tools Maximum manual force 200 N Maximum gradient for operation 0 degrees Maximum wind force Internal use only 0 zero mph Maximum wheel force 234 kg Maximum castor point load 234 kg 2 29k...

Страница 4: ...a goods lift or crane 3 Never exceed horizontal forces maximum horizontal force 200N 4 Never use in the vicinity of live conductors 5 Never try to move the Ecolift on its wheels when elevated 6 Never...

Страница 5: ...RIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Flywheel Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Lowering Tool Tool Tray Gates Platform Tray Flywheel Handle Courtesy of Crane Market...

Страница 6: ...restraint type harness should be worn with a very short lanyard Operating procedures are divided into three key areas 1 Pre operation checks What to do before operating the Ecolift 2 Normal operation...

Страница 7: ...reely Turn once anti clockwise to come down pic 5 9 Check emergency lowering tool is attached on the chassis If any of the above items are faulty or do not work correctly then do not use the machine N...

Страница 8: ...ne attach hook end of emergency lowering tool to flywheel handle knob in basket releasing handle knob turn wheel anti clockwise to bring platform down pic 2 3 Keep clear of structure as it descends 5...

Страница 9: ...operates correctly step into the platform to do this do not attempt to operate the handle from outside the basket Pull flywheel handle knob towards you release Ensure handle springs back to lock whee...

Страница 10: ...st interlock is undamaged Check the casing for signs of damage and remove the end plate Pic 1 shows mast interlock with cover on Check the plunger is free to move by holding end with long nosed pliers...

Страница 11: ...and that they rotate freely Ensure there is no cut or wear to wheel that penetrates more than 4mm in depth The original wheel diameter is 200mm 10 Check castor condition in accordance with the followi...

Страница 12: ...nables a higher bolting torque to be applied This will improve the reliability of the fix but will not increase the strength of the castor assembly The new fixing nut and bolt are to be re torqued to...

Страница 13: ...n so if visible distortion is evident a significant impact will have occurred and under these conditions the castor and fixing must be replaced Typical signs of impact which would require castor and f...

Страница 14: ...straps can be located around the base of the machine without the need for the driver to have to climb onto the bed of the vehicle Note only trained qualified forklift drivers are to load the Ecolift...

Страница 15: ...red location on the vehicle and tie down as described above Towing It is the responsibility of the driver to ensure safe practice is employed in order to access the vehicle bed in order to manoeuvre t...

Страница 16: ...the machine is fully lowered and ideally place a cover over the machine Only store or transport the Ecolift in an upright position Upon removal from storage and prior to returning to use ensure machi...

Страница 17: ...700 I Step ECL M 701 J Emergency Lowering Tool ECL M 703 K Platform Tray ECL M 704 L Ecolift Decal Set 1 ECL M 800 M Ecolift Decal Set 2 ECL M 802 KEY SPARE PARTS A B C D E F G H I J K L M CASTOR CHA...

Страница 18: ...gents for repair or assessment against a warranty claim on any Ecolift or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arising from th...

Страница 19: ...19 DECAL PLACEMENT 2 A 3 A B 4 5 6 A B B A B A 1 A A B A 7 A C B Courtesy of Crane Market...

Страница 20: ...4 A Spirit Level Guidance Left hand side of spirit level on chassis cover 5 A Emergency lowering procedure Chassis cover left hand side of mast B Do not enter the area underneath Centre of chassis co...

Страница 21: ...n 8 A Horizontal pull force max 200 N Middle of mast internal face B Safety Requirements Middle of mast internal face C Harness Point Lower mast internal face above hook 9 A Elevate Centre of flywheel...

Страница 22: ...erson tools Maximum manual force 200 N Maximum gradient for operation 3 degrees Maximum wind force Internal External 12 5 m s Maximum wheel force 245 kg 2 4 kN Maximum castor point load 245 kg 2 4 kN...

Страница 23: ...ck to prevent handle turning Do not use machine if handle knob is damaged or sticking 6 Cordon off work area in accordance with guidelines 7 Safe working load for the Ecolift WR is 1 person only plus...

Страница 24: ...goods lift or crane 3 Never exceed horizontal forces never use in wind exceeding 12 5m sec 4 Never use in the vicinity of live conductors 5 Never try to move the Ecolift on its wheels when elevated 6...

Страница 25: ...s Check rear wheels to ensure retention circlip is securely fitted and undamaged When replacing components for any reason only use OEM specification parts either supplied from the manufacturer or auth...

Страница 26: ...TEST RESULTS NOTES Description Work Carried out Date ALTERATIONS REPAIRS Description Work Carried out Date Courtesy of Crane Market...

Страница 27: ...Courtesy of Crane Market...

Страница 28: ...ECO OP UK 12 15 www powertowers com 100 British designed and manufactured Powered by TCPDF www tcpdf org Courtesy of Crane Market...

Отзывы: