Operating Instructions, Form No. 102561, Back sheet 2 of 4
Hydraulic Gauge
1. Remove the pipe plug from the gauge port.
2. Remove the four cap screws holding the valve to the pump
plate and lift the valve off the pump plate. Do NOT kink the
air lines.
3. Apply Power Team HTS6 thread sealant or PTFE tape to
the threads of the gauge. Thread the gauge into the gauge
port and tighten with a wrench.
4. Assemble the valve back onto the pump plate.
Pressure Regulating Valve
The pressure regulating valve can be adjusted to by pass oil at a desired pressure setting while the pump continues
to run.
1. Loosen the locknut on the pressure regulating valve. Turn the adjusting screw a few turns counterclockwise
(CCW) to decrease the pressure setting to a lower than desired pressure.
Note: For easy adjustment of the pressure regulating valve, always adjust the pressure by INCREASING it to
an appropriate pressure setting.
2. Connect the pump air supply and place the remote flow control valve in the advance position.
3. Slowly turn the adjusting screw in a clockwise (CW) direction to gradually increase the pressure setting. When
the desired pressure setting is reached, lock the adjusting screw in position by tightening the locknut.
TROUBLESHOOTING GUIDE
WARNING
•
To prevent injuries, any repair work or troubleshooting must be done by qualified personnel familiar
with this equipment.
HYDRAULIC SCHEMATIC
ACCESSORY INSTALLATION
Next
Page