
LSB-3000 Series
jjautomation.com
10
• 2 x P&F NJ2-V3-N
• 4 x P&F NJ2-V3-N
-
Position Transmitter Option
a) With mA loop calibrator
b) With multi-meter
<2 x SPDT single coil + Position transmitter>
- Setting
10.1 Earthing
The Postioner must be connected to a good quality earth. The units are provided with internal and
external earthing terminals which are both located on the terminal chamber section of the unit
① It is necessary to set Zero and Span of position transmitter manually.
② The power supply of 12 – 30VDC should be supplied.
- Install the LSB-7 properly before setting the position transmitter.
- Check the proper position of the RA/DA switch before setting.
1. Turn the Zero screw until the output signal reaches 4mA.
2. Turn the Span screw until the output signal reaches 20mA.
3. Repeat the above procedure until the output signals reach 4mA and 20mA.
4. Operate the valve and check if the output signals are transmitted properly.