Powered by Safety
®
55
IB-65020A
Recommended Renewal Parts and Replacement Procedures
d. Bolt the new assembly in place and
reconnect it to the wiring harness. No
adjustment is required.
e. Reassemble the connecting rod and
main closing spring, if previously
removed.
f. Trip the circuit breaker several times
electrically to ensure that secondary
shunt trip coil assembly is functioning
properly.
g. Replace the front cover.
5) Undervoltage Device Assembly (UV)
Refer to
SM-1800 Undervoltage Assembly
for
replacement and installation procedures.
6) Charging Motor Assembly
Refer to
SM-1200 Charging Motor
Assembly
for replacement and installation
procedures.
7) Anti-Pump Relay Assembly
Refer to
SM-1000 Anti-Pump Relay
Assembly
for replacement and installation
procedures.
8) Latch Check Switch
Refer to
SM-1400 Latch Check Switch
Assembly & Tripping System Mechanism
Adjustment
for replacement and installation
procedures.
9) Motor Cutoff Switch Assembly
Refer to
SM-1500 Motor Cutoff Switch
Assembly
for replacement and installation
procedures.
10) Auxiliary Switch
Refer to
SM-1100 Auxiliary Switch Assembly
for replacement and installation
procedures.