Powered by Safety
®
22
Installation
01.4IB.51000C
PowlVac® Metal-Clad Switchgear
5kV & 15kV
h. t
he
r
emovABle
e
lement
The removable element may be shipped
loose in its own protective box or inserted
in the switchgear when the equipment is
installed in a PCR
®
. If the circuit breaker is in
the switchgear, it will be locked in place by a
special bracket designed to prevent motion
during shipment. This bracket must be
removed and discarded in order to move the
circuit breaker (Figure 13, a).
Figure 13 Circuit Breaker with Shipping Bracket
a
a. Shipping Bracket
Figure 14 Auxiliary Device with Shipping
Bracket
a. Shipping Bracket
a
Before installing or operating a removable
element, such as the circuit breaker, ground
and test device, or dummy removable element,
consult the instruction bulletin for directions
on installation, maintenance, and renewal parts
for that particular element.
!
CAUTION
Prior to inserting a removable element into
the compartment, manually check the shutter
mechanism, the mechanism-operated cell
(MOC) switch and operating mechanism, and
the truck-operated cell (TOC) switch for free
movement. These checks shall be made with
all circuits deenergized.