1- Moun ng Fixture and Op cal Fiber Installa on
Required for Installa on
A - Secure the Moun ng Fixture to Busbar and Connect Fiber
Tools for Fiber Moun ng:
Adjustable Wrench
1.5 mm Allen Key
Guillo ne Cu er
Components for Hardware Installa on:
B - Route the Fiber to Low-Voltage Cabinet
I. Insert the screw with the washer through the
fixture and busbar.
II. Insert the washers and secure it with a nut.
Ensure the hole for fiber inser on is pointed in
the direc on of the fiber rou ng.
Installa on of the BriteSpot Fiber-Op c Temperature Sensor has been engineered to be simple and straigh orward. The
following manual will describe in detail the 3 steps needed for installa on. No specialized knowledge of fiber op cs is
necessary. A basic understanding of switchgear topology and moun ng methods is required.
35 mm DIN rail (6"-8") and moun ng
hardware
CAT5 Ethernet cable (if connec ng to SCADA or
computer.
Quick Start Guide
G3
BriteSpot
Temperature Monitoring
Powell Canada Inc,
Suite 201, 55 Gos ck Place
North Vancouver, BC, V7M 3N2
- MAX 100ºC
Sensor Tip
- MAX 120ºC
Fiber
R
Do NOT bend fiber ghter
than 12 mm (1/2") radius
Do not fasten or a ach ANY
moun ng hardware ( e-wraps,
etc.) to at least a 30 cm (12")
length of fiber between the
por on of the probe at high
v o l t a g e a n d i t s fi r s t n o n -
energized point of contact.
Keep away from sources of
excessive heat whenever
possible. Fiber probe shall not
be a ached to surfaces with
te m p e rat u re s exc e e d i n g
100ºC or 200ºF.
!
!
Voltage: 12-24 VDC (0.12A@24VDC)
Power: 3 Wa s (Max)
Power Supply Requirements:
III. Insert fiber into the holding fixture and secure it
with a 1.5 mm hex screwdriver.
Avo i d r u n n i n g fi b e rs I n t h e
direc on of the fold of the boot to
minimize bending and damage of
the fiber.
!