Date: 17‐Nov‐15
www. potterybarn.com
Page 6 of 8
Rev:
4.
If needed, mounting blocks need to be centered on the sides and even with the top of the console. Use a dry
cloth to wipe off any dirt or dust from the top edge of console, apply high quality silicone or acrylic based bath
sealant to top edge of console.
DO NOT USE PLUMBERS PUTTY OR ANY OIL BASED SEALANT AS THIS
WILL STAIN THE MARBLE
.
Carefully lift up the marble countertop (B) with basin attached to place it onto the console base. Adjust the basin
position to make sure drain holes are right on top of the cutout for drainpipe on the shelf.
Now, secure the basin tightly.
Avoid moving the top after it has been set into place. Allow the top to dry a minimum of 24 hours to allow for proper
adhesion to the console.
5. Use high quality silicone or acrylic based bath sealant to install splash (D) and Side in place, clean up any
excess immediately with a clean damp rag.
DO NOT USE PLUMBERS PUTTY OR ANY OIL BASED
SEALANT AS THIS WILL STAIN THE MARBLE
. Wipe off any excess wax or residue that may have
accumulated around sink area.
Caution: For safe handling, 2-3 people are
recommended.
Note: Always carry any natural stone
vertically. Carrying stone products flat may
cause cracking or breakage.
C
B
D
C