17
12/07/2011 - 300025089-001-B
NXR4i
19 Hydraulic test
After assembling the boiler body, the installer must carry out a water tightness test at a pressure equal to 1.3 times the operating pressure (that
is 7.8 bar mini) for 10 minutes at least.
The test must be done at room temperature.
Ensure that all the air in the boiler is vented to avoid any bursting of the body.
8x
C003364-B
1
2
C003366-B
4
3
Содержание NXR4i
Страница 1: ...Working towards a cleaner future NXR4i Assembly Instructions August 2011 heating specialists ...
Страница 5: ...5 12 07 2011 300025089 001 B NXR4i 1 2 M001233 C C003341 A 1 2 ...
Страница 8: ...8 NXR4i 12 07 2011 300025089 001 B 7 8 3 Silicon supplied C003348 C C003349 B 1 100 ...
Страница 16: ...16 NXR4i 12 07 2011 300025089 001 B 17 18 10x C003362 B M12 8x C003363 B ...
Страница 21: ...21 12 07 2011 300025089 001 B NXR4i 25 C003419 B 1 2 2 0 12 ...
Страница 26: ...26 NXR4i 12 07 2011 300025089 001 B 32 Mounting of the rear insulation C003372 A C003376 B ...
Страница 29: ...29 12 07 2011 300025089 001 B NXR4i 38 39 L000068 C003421 A 1 1 2 C003420 B 4 3 5 7 8 8 7 7 6 ...
Страница 30: ...30 NXR4i 12 07 2011 300025089 001 B 40 2x M5 C003423 B ...
Страница 32: ...32 NXR4i 12 07 2011 300025089 001 B 42 43 C003427 A C003428 A 2 1 4x M5 x 25 ...
Страница 35: ...35 12 07 2011 300025089 001 B NXR4i 47 48 C003433 A C003439 A ...
Страница 36: ...36 NXR4i 12 07 2011 300025089 001 B 49 C003440 A ...
Страница 38: ...38 NXR4i 12 07 2011 300025089 001 B ...
Страница 39: ...39 12 07 2011 300025089 001 B NXR4i ...